Free 186 More Best Homemade Tools eBook:  
Get tool plans

User Tag List

Results 1 to 8 of 8

Thread: Dismantling a TV tower - video

  1. #1
    Supporting Member Altair's Avatar
    Join Date
    Aug 2013
    Posts
    12,020
    Thanks
    1,365
    Thanked 30,313 Times in 9,998 Posts

    186 More Best Homemade Tools eBook

  2. The Following 2 Users Say Thank You to Altair For This Useful Post:

    nova_robotics (Nov 3, 2021), rlm98253 (Oct 30, 2021)

  3. #2

    Join Date
    Mar 2020
    Posts
    350
    Thanks
    13
    Thanked 47 Times in 41 Posts
    Will the Aussies shed some light on their guy-wire tower crane?

    2,000+ Tool Plans

  4. #3
    Supporting Member Bony's Avatar
    Join Date
    May 2015
    Location
    Tasmania, Australia
    Posts
    381
    Thanks
    63
    Thanked 184 Times in 66 Posts

    Bony's Tools
    I wish I could because it looks interesting, but I live a few thousand ks from Sydney.

  5. #4
    meyer77's Avatar
    Join Date
    Feb 2019
    Posts
    315
    Thanks
    2
    Thanked 66 Times in 46 Posts
    What is the reason for a tarp? Looks like a slow process, how long for whole job?

  6. #5
    Supporting Member Frank S's Avatar
    Join Date
    Aug 2015
    Location
    Peacock TX
    Posts
    11,634
    Thanks
    2,186
    Thanked 9,134 Times in 4,366 Posts

    Frank S's Tools
    I might be able to shed some light on a few of the questions.
    Tower cranes, or any crane for that matter are limited in height in direct proportion to their base or foundation footings.
    when it comes to a fixed tower crane a deep and substantial foundation must be poured or a platform assembled on site to support the weight of the crane and the loads being hoisted, additionally they are generally attached to the building or other structure where the work is being preformed every so many feet in height when there is no building to use as anchorage then guy wires are required. Again depending on the maximum height the crane is going to be working from these guy wires are placed anywhere between each 75 to 150 feet in elevation of the crane's structure.
    Good jobsite rigging practice is expensive, and time consuming. Poor jobsite rigging can cost a 1000 to even a million times more than doing it right.
    the reason for the huge tarp is to provide a work area for final disassembly in an effort to prevent loss of tools or hardware into the ground and to prevent what is known as location contamination.
    That first 100ft or so section lowered might have seemed to have taken a long time to accomplish but you have to understand the crane operator could be a 1000 or more feet up in the air. If this was my contract the tower crane height would be reduced after every couple hundred feet of tower structure reduction doing this would actually save time and increase safety
    Never try to tell me it can't be done
    When I have to paint I use KBS products

  7. The Following User Says Thank You to Frank S For This Useful Post:

    mansworld (Nov 3, 2021)

  8. #6
    Supporting Member IntheGroove's Avatar
    Join Date
    May 2019
    Location
    Lake Tahoe
    Posts
    2,093
    Thanks
    195
    Thanked 944 Times in 573 Posts

    IntheGroove's Tools
    The foundation for the crane was probably already there from when the tower was erected...

  9. #7
    Supporting Member Frank S's Avatar
    Join Date
    Aug 2015
    Location
    Peacock TX
    Posts
    11,634
    Thanks
    2,186
    Thanked 9,134 Times in 4,366 Posts

    Frank S's Tools
    Quote Originally Posted by IntheGroove View Post
    The foundation for the crane was probably already there from when the tower was erected...
    maybe a small one to anchor a draw works winch. Towers like that one once the 4 lattice legs merged into a single would have been built piece meal with a single climbing jib going up 1 leg of the lattice structure.
    A helicopter pilot friend of mine goes all over the world for the company he works for dong lifts such as erecting and the deconstruction or relocating communications towers, or lifting repair parts for wind turbines, a lot faster safer and cheaper than erecting a crane of that size for a short term job.
    Never try to tell me it can't be done
    When I have to paint I use KBS products

  10. #8
    Supporting Member
    Join Date
    Sep 2018
    Posts
    2,355
    Thanks
    11,180
    Thanked 1,223 Times in 667 Posts

    nova_robotics's Tools
    Pfffft. Pansies. They should do it like this guy.




    2,000+ Tool Plans

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •